EPC project – 16 Storage tanks and a new jetty
Scope Full scope – Study, construction, delivery and erection of 16 storage tanks and a new jetty (incl. tank construction, jetty equipped with among others 44 loading arms, piping and related infrastructure) |
Challenge Short delivery period and the existing infrastructure remains in use during the execution of the works |
Key facts & figures Full scope project – 16 storage tanks and a new jetty Storage tanks: Capacity: 8x 1,500 m³ and 8x 3,000 m³ Material: Duplex stainless steel Code: EN 14015 Off-site built Jetty: 2 modules were off-site constructed (incl. piping, pig stations, valves, walkways and stairways) and transported with a crane pontoon. |
Reference 30382-30791 |