EPC project – Transport and handling installation for co-firing of wood pellets
Scope EPC project – Study, construction, delivery, erection and commissioning of a new transport and handling installation for co-firing of wood pellets |
Key facts & figures Modification of existing power plant in order to be able to co-combust wood pellets. The scope of Geldof comprises the mechanical materials handling system, including Electrical, Instrumentation and Controls. Pellet conveying from ship unloading hopper to storage Silo reclaim system, conveyors to boiler house and dosing to mill system Screening and ferrous metal separation Structural steel works, including cleaning tower, support structures of the conveyors and the silo roof Fire/explosion protection, detection and fire-fighting systems Electrical, Instrumentation and control systems |
Reference 31012 |