Scope Turnkey EPC-contractor for the fuel handling installation in a power plant |
Key facts & figures Product: Wood pellets Turnkey engineered project including continuous ship/barge unloading, conveyer belts, 2 silos with a capacity of 5,000 m³ each including extraction system, pellet milling towers, pneumatic injection of wood dust in the boilers, 2,000 mt construction steel, etc. Guaranteed performance: safety, availability, efficiency, durability |
Challenge Transformation of a coal fired power plant to co-firing with 20% biomass (wood pellets), i.e. 75 tonnes per hour. |