Turnkey biomass handling installation @ power plant
Scope
Turnkey EPC-contractor for the fuel handling installation in a power plant
Key facts & figures
Product: Wood pellets
Turnkey engineered project including continuous ship/barge unloading, conveyer belts, 2 silos with a capacity of 5,000 m³ each including extraction system, pellet milling towers, pneumatic injection of wood dust in the boilers, 2,000 mt construction steel, etc.
Guaranteed performance: safety, availability, efficiency, durability
Challenge
Transformation of a coal fired power plant to co-firing with 20% biomass (wood pellets), i.e. 75 tonnes per hour.
Reference
24049