At TransTank we are on the last straight line to the finish.
The floating suction and also the safety valves are installed.
Two of the three tanks have already been painted. Within a couple of weeks the third tank will also be covered in paint.
The fire extinguishing system and the sprinkler system is installed on the first tank, installation on the second tank is in full swing.
22th of September, 2021