05.09.2025
A solid foundation for the future
Two aging conveyor belts and a wagon loader at HES Bulk Terminal Rotterdam stood no chance against our team’s determination. Within a tight time frame, we tore down, rebuilt, and replaced them – boosting both reliability and capacity.
What it took:
- 250 tons of steel lifted, installed, and aligned
- A deadline that left zero room for error
The result? A flawless execution of a high-stakes maintenance project that keeps operations moving forward stronger than ever.




