From combustor to silos, continuing the love story
13.02.2026

From combustor to silos, continuing the love story

Some projects don’t end, they evolve.
We’re happy to continue our collaboration with Doosan Lentjes on a new assignment for FOSTER Gent: the fabrication of seven steel silos. After delivering the combustor in October, we’re now adding the next chapter to this industrial love story.

The next chapter includes:

  • 4 silos (Ø 6 m) for Dry Sewage Sludge
  • 1 silo (Ø 2.85 m) for FGT Residue
  • 2 silos (Ø 6 m) for Fly Ash

The Fly Ash and Residue silos will be fully insulated and equipped with heat-traced cones, because in long-term relationships, reliability matters.

All fabrication happens in our own workshop, with shipment by vessel straight to site.

End-to-end execution, built on trust, steel and a strong partnership.