3 Towers
Scope
- Study, procurement and construction of a de-propanizer, de-ethanizer and de-methanizer
Key facts & figures
- Construction of a de-propanizer, de-ethanizer and de-methanizer
- Diameter: from 1.8 m up to 6.8 m
- Length (TL/TL): from 23.9 m up to 45.9 m
- Material: Carbon steel
- Code: ASME VIII div.1 / ASME VIII div.2
- Shop-built
Reference
- 55290