EPC project – 16 Storage tanks and a new jetty

EPC project – 16 Storage tanks and a new jetty

Scope

  • Full scope – Study, construction, delivery and erection of 16 storage tanks and a new jetty (incl. tank construction, jetty equipped with among others 44 loading arms, piping and related infrastructure)

Challenge

  • Short delivery period and the existing infrastructure remains in use during the execution of the works

Key facts & figures

  • Full scope project – 16 storage tanks and a new jetty
  • Storage tanks:
    • Capacity: 8x 1,500 m³ and 8x 3,000 m³
    • Material: Duplex stainless steel
    • Code: EN 14015
    • Off-site built
  • Jetty:
    • 2 modules were off-site constructed (incl. piping, pig stations, valves, walkways and stairways) and transported with a crane pontoon.

Reference

  • 30382-30791