Scope
- Full scope – Study, construction, delivery and erection of 16 storage tanks and a new jetty (incl. tank construction, jetty equipped with among others 44 loading arms, piping and related infrastructure)
Challenge
- Short delivery period and the existing infrastructure remains in use during the execution of the works
Key facts & figures
- Full scope project – 16 storage tanks and a new jetty
- Storage tanks:
- Capacity: 8x 1,500 m³ and 8x 3,000 m³
- Material: Duplex stainless steel
- Code: EN 14015
- Off-site built
- Jetty:
- 2 modules were off-site constructed (incl. piping, pig stations, valves, walkways and stairways) and transported with a crane pontoon.
Reference
- 30382-30791