EPC project – Transport and handling installation for co-firing of wood pellets

EPC project – Transport and handling installation for co-firing of wood pellets

Scope

  • EPC project – Study, construction, delivery, erection and commissioning of a new transport and handling installation for co-firing of wood pellets

Key facts & figures

  • Modification of existing power plant in order to be able to co-combust wood pellets. The scope of Geldof comprises the mechanical materials handling system, including Electrical, Instrumentation and Controls
  • Pellet conveying from ship unloading hopper to storage
  • Silo reclaim system, conveyors to boiler house and dosing to mill system
  • Screening and ferrous metal separation
  • Structural steel works, including cleaning tower, support structures of the conveyors and the silo roof
  • Fire/explosion protection, detection and fire-fighting systems
  • Electrical, Instrumentation and control systems

Reference

  • 31012