Scope
- EPC project – Study, construction, delivery, erection and commissioning of a new transport and handling installation for co-firing of wood pellets
Key facts & figures
- Modification of existing power plant in order to be able to co-combust wood pellets. The scope of Geldof comprises the mechanical materials handling system, including Electrical, Instrumentation and Controls
- Pellet conveying from ship unloading hopper to storage
- Silo reclaim system, conveyors to boiler house and dosing to mill system
- Screening and ferrous metal separation
- Structural steel works, including cleaning tower, support structures of the conveyors and the silo roof
- Fire/explosion protection, detection and fire-fighting systems
- Electrical, Instrumentation and control systems