Full scope project – 3 storage tanks

Full scope project – 3 storage tanks

Scope

  • Full scope – Study, construction, delivery, erection and protection of 3 storage tanks (incl. civil works and steel structures)

Key facts & figures

  • EPC project – Construction of 3 storage tanks (incl. civil works and steel structures).
  • Capacity: from 130 m³ up to 6,400 m³
  • Diameter: from 5 m up to 25 m
  • Height: from 8 m up to 14 m
  • Material: Carbon steel and Stainless steel
  • Code: EN 14015
  • Product: Sulphuric acid / Urea formaldehyde / Aluminium sulphate

Reference

  • 30535