Turnkey coal handling and blending installation
Scope
- New turnkey coal handling and blending installation on reclaimed land including all electrical works and instrumentation
Key facts & figures
- Several conveyors: 6,000 mmt/h – 4,500 mmt/h – 2,000 mmt/h, with a total length of 1,8 km
- 8 concrete blending silos each 8,000 m³ equipped with steel cone and extraction 2,000 mmt/h
- De-dusting system in boilerhouse – 40,000 m³/h
- Particular attention for lifting and installing pre-assembled steel structures +/- 500 t
Reference
- 27032