Turnkey coal handling and blending installation

Turnkey coal handling and blending installation

Scope

  • New turnkey coal handling and blending installation on reclaimed land including all electrical works and instrumentation

Key facts & figures

  • Several conveyors: 6,000 mmt/h – 4,500 mmt/h – 2,000 mmt/h, with a total length of 1,8 km
  • 8 concrete blending silos each 8,000 m³ equipped with steel cone and extraction 2,000 mmt/h
  • De-dusting system in boilerhouse – 40,000 m³/h
  • Particular attention for lifting and installing pre-assembled steel structures +/- 500 t

Reference

  • 27032