06.06.2025
Smart execution, tight space
Even when the build location is tighter than a lid on a jar of pickles, Geldof gets the job done with precision and care.
On this Cargill site, positioning the crane alone required a sharp eye:
- A narrow setup zone
- Complex stabilization
- An underground gas pipeline – just to spice things up
Thanks to thorough preparation and smart coordination, we carried out the build safely, efficiently, and without compromise.
A positive site inspection from Fluxys was the cherry on top.
No space? No problem! Just call Geldof for a safe and reliable solution.