Scope
- Tank Maintenance – Complete overhaul of 3 storage tanks
Key facts & figures
- Complete overhaul of 3 storage tanks according API 650 / API 653 / EEMUA 154 / EEMUA 159 / EEMUA 183 / PGS 29
- Repair tank bottom (2 storage tanks) and new tank bottom and annular ring (1 storage tank)
- Removal of the existing external floating roof and installation of a new complete aluminium dome roof and aluminium suspended full contact internal floating roof (1 storage tank)
- New seal
- Renovation of tank mound
- Modification/renewal platform, walkway and railing
- New wind stiffener, drip ring, internal piping, valves and spherical staircase
- Internal and external coating
- Civil works
Reference
- 31917