Scope
- Tank Maintenance – Full scope – Complete overhaul of 2 storage tanks with external floating roof
Key facts & figures
- Complete overhaul of 2 storage tanks with external floating roof
- Replacement of bottom plates (1 tank)
- Jacking of floating roof for the refurbishment of sand foundation and the renewal of tank bottom (1 tank)
- Renewal of appendages shell and roof
- Reparation/modification of secondary steel
- Renewal (1 tank) and reparation (1 tank) of foam and sprinkler system
- Maintenance works on pontoons
- Civil works tank pit
- E&I